Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 34 results ...

Abeid, J N (2000) Photo-net: An integrated system for controlling the progress of construction activities, Unpublished PhD Thesis, , Illinois Institute of Technology.

Al-Musallam, A A (2002) A web-based approach for coordinating architectural drawings with other construction documents, Unpublished PhD Thesis, , Illinois Institute of Technology.

Al-Sobiei, O S (2001) Assessment of risk allocation in construction projects, Unpublished PhD Thesis, , Illinois Institute of Technology.

Alavipour, S M (2017) Project scheduling using optimized financing, Unpublished PhD Thesis, , Illinois Institute of Technology.

Alkoud, A (2023) Investigating the impact of tall building ordinances (TBOs) on the evolution of ultra-tall buildings typology: Case studies in Chicago and Dubai, Unpublished PhD Thesis, , Illinois Institute of Technology.

Alothaimeen, I (2018) Multi-objective optimization for LEED: New construction using genetic algorithms, Unpublished PhD Thesis, , Illinois Institute of Technology.

Barbarosoglu, B V (2018) Early detection of maintainability issues in MEP systems using BIM, Unpublished PhD Thesis, , Illinois Institute of Technology.

Chotibhongs, R (2011) Managing the bidding process for the construction owner-detection and prevention of unbalanced bids and collusive bids, Unpublished PhD Thesis, , Illinois Institute of Technology.

Gunaydin, H M (1999) Impact of information technologies on project management functions, Unpublished PhD Thesis, , Illinois Institute of Technology.

Gunhan, S M (2003) Foreign market entry decision model for construction companies, Unpublished PhD Thesis, , Illinois Institute of Technology.

Hanioglu, M N (2014) Influence of owner-organization impression and contract framing on construction contractors' risk perceptions, Unpublished PhD Thesis, , Illinois Institute of Technology.

Ibrahim Mahmoud, M M (2005) An xml initiative of transferring architectural information to the construction site based on the BIM object concept, Unpublished PhD Thesis, , Illinois Institute of Technology.

Kale, S (1999) Competitive advantage in the construction industry: Firm-specific resources and strategy, Unpublished PhD Thesis, , Illinois Institute of Technology.

Kaplanoglu, S B (2007) Impact of pre-project peer review on project success, Unpublished PhD Thesis, , Illinois Institute of Technology.

Kleps, S M (2013) Impact of workflow disruptions, project characteristics and foremen characteristics on improvisational decisions and actions on construction sites, Unpublished PhD Thesis, , Illinois Institute of Technology.

Koksal, A (2002) Predicting the development of decline in construction companies, Unpublished PhD Thesis, , Illinois Institute of Technology.

Le, K T (2017) Material inventory control and management system in construction using GIS applications and a "hybrid" tracking system, Unpublished PhD Thesis, , Illinois Institute of Technology.

Lee, D-E (2004) Construction business automation system (CBAS), Unpublished PhD Thesis, , Illinois Institute of Technology.

Lee, S H (2010) Optimal highway investment decision-making under risk and uncertainty, Unpublished PhD Thesis, , Illinois Institute of Technology.

Ma, L (2022) A BIM-based life cycle assessment tool of embodied energy and environmental impacts of reinforced concrete tall buildings, Unpublished PhD Thesis, , Illinois Institute of Technology.

Mochtar, K (2000) Market-based pricing in construction, Unpublished PhD Thesis, , Illinois Institute of Technology.

Pandey, A R (2016) Heuristic decision-making model for electrical foremen when workflow is disrupted, Unpublished PhD Thesis, , Illinois Institute of Technology.

Pulket, T (2008) Universal prediction model for construction litigation, Unpublished PhD Thesis, , Illinois Institute of Technology.

Rashed, A (2022) Influence of internal factors in construction organizations on the implementation of integrated project delivery viewed from the organizational change theory, Unpublished PhD Thesis, , Illinois Institute of Technology.

Riad, N I (1990) MODA: An expert system for managing owner-directed acceleration, Unpublished PhD Thesis, , Illinois Institute of Technology.

  • Type: Thesis
  • Keywords: dispute resolution; disputes; expert system; mediator; owner
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/303864695
  • Abstract:
    MODA, an acronym for Managing Owner Directed Acceleration, is a knowledge-based expert system that can be used as a dispute resolution tool for managing owner-directed acceleration. This tool is intended to be used as an aid for helping owners and contractors foresee the implications of accelerating a project in terms of cost and liabilities involved. The system has an analysis program written in LISP as its backbone. After obtaining the initial information from the user, the system triggers the analysis program. The analysis program analyzes the files submitted by the user then gives back control to the system. The system will first assign liabilities to the parties for past events such as cancelled, added, and modified activities that were not foreseen in the original schedule. It will do this by means of a set of if-then rules and certainty factors based on the responses obtained from the user. The system will then incorporate this information chronologically into a compression analysis, which to our knowledge is the first attempt ever to automate the compression analysis, performed on the remaining portion of the project and will clarify the parties liable for the proposed acceleration. The system can make a human mediator's job more effective and economical, but can also reduce the occurrence of acceleration-related disputes considerably. Indeed, the system will be available to all parties at all times; the owner who is planning to accelerate the remaining portion of the project will be able to observe the expected consequences (in terms of the parties' responsibilities with respect to time and money) by running the planned action through the system before the change is initiated. Similarly, the contractor will know ahead of time whether the acceleration ordered by the owner is wholly or partly his responsibility. This will help the parties in reaching an agreement before the decision for acceleration is made by the owner.

Rujirayanyong, T (2004) Data warehousing for construction, Unpublished PhD Thesis, , Illinois Institute of Technology.

Saleh, E (2020) A risk-based approach in selecting design natural hazard loads for temporary structures, Unpublished PhD Thesis, , Illinois Institute of Technology.

Suh, K (1993) RUSS: A scheduling system for repetitive-unit construction using line-of-balance technology, Unpublished PhD Thesis, , Illinois Institute of Technology.

Tokdemir, O B (2003) ALISS: Advanced linear scheduling system, Unpublished PhD Thesis, , Illinois Institute of Technology.

Yang, J (2022) Integrated decision support system for the selection and implementation of delay analysis in construction projects, Unpublished PhD Thesis, , Illinois Institute of Technology.

Yasamis, F (1999) Contractor quality performance (CQP) evaluation model in pavement projects, Unpublished PhD Thesis, , Illinois Institute of Technology.

Zhang, C (2013) Automated progress control using laser scanning technology, Unpublished PhD Thesis, , Illinois Institute of Technology.

Zhou, B (2012) Optimal decision-making of interdependent transportation investment alternatives under risk and uncertainty, Unpublished PhD Thesis, , Illinois Institute of Technology.

Zhou, Q (2002) From CAD to IAD: An internet application of steel construction consulting for architects, Unpublished PhD Thesis, , Illinois Institute of Technology.